Allan Block Muros de Contención 

Donde Comprar | Contáctenos |  Fotos  |  Videos  |  Allan Block USA 



Building Turn-Ins

Documento Imprimible (.pdf)

For a graceful, flowing end to the wall, curve the wall to create a plantable area that can soften the look of the wall.

When building a turn-in, a base trench will need to be excavated, backfilled and compacted, the same as the base course of blocks.

Proper backfilling and compaction is important, where the wall turns back into the slope. To ensure the turn-in area doesn’t settle differently than the rest of the wall, make sure the entire area below the new base is compacted thoroughly.

Construcción de Acabados Escalonados Curvos

Building Turn-Ins

Compactarla Escalonados Curvos
Escalonados Curvos

 |  Sala de Prensa  |  Términos y Condiciones  |  Información de la empresa  |  AB Internacional  |  Preguntas más frecuentes